Friday, October 30, 2015

Materials and thank you Browns Point Marina.

 



As for material, that came from Browns point marina in Keyport NJ, please check these guys out if you need a boat, slip, storage, boat rentals, boat repairs, all kinds of boating products they are awesome. Thank you Sam and Brown’s Point Marina.


Click here to visit www.brownspointmarina.net


Don’t underestimate how much it will cost and what you will need to do your deck, stingers, bulkheads over.


It will add up fast and not be cheap.


I have enough resin and gel coat left to finish the boat off.  So I will use 7 gallons of resin and 1 gallon of gel coat.


Tons of mixing cups

8 cheap plastic measuring cups

10 4″ rollers

12 4″ brushes

4 4’x8′ 1/2″ marine grade plywood

1 4’x8′ 3/4″ marine grade plywood

12 yards of 1708 bi axle fiberglass cloth

150 stainless screws 1″ and 2″

1 10ft section of drainage pipe

1 motor well boot

1 17″ x 12″ boat hatch

30 2″ spring clamps

5  Loctite brand premium PL construction adhesive caulk gun cartridges

2  Loctite marine PL adhesive (this stuff is new, its like 3M 5200) (used for sealing any and all screws that went into the finished deck)

1 pint of MEKP ( I need more than came with the resin, I almost double the amount since I was always working in sub 70F temps.)


I will keep adding to the list as the project progresses.




 

No comments:

Post a Comment